No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | SH | SA | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | PT.CIVARLIGMA ENGINEERING - 02.745.802.5-311.000 | 100,0 | 100,0 | 97,0 | Rp. 277.860.000,00 di bawah 80% Nilai HPS |
Rp. 277.860.000,00 di bawah 80% Nilai HPS |
100,0 | 9.760,0 | |||||||||
2 | PT. Plantika Sakti Engineer Konsultan - 01.238.558.9-311.000 | 63,59 | 63,59 | Tidak menghadiri pembuktian kualifikasi | |||||||||||||
3 | PT. Gita Yasa Konsultan - 01.486.115.7-311.000 | 25,29 | 25,29 | ||||||||||||||
4 | PT. CIPTA WAHANA KONSULTAN - 01.670.599.8-311.000 | ||||||||||||||||
5 | CV. UTAKA ESSA KONSULTAN - 01.591.104.3-311.000 | ||||||||||||||||
6 | CV. PROFIL CONSULTANT - 01.633.606.7-311.000 | ||||||||||||||||
7 | PT. IDEAL DESAIN ENGINEERING - 01.238.362.6-311.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak